It does not constitute professional advice. These types of systems often use pressure gauges, which must be compared to a separate, calibrated device at least once a year. Gas cylinder normally charged 8. In addition, any new system must be reviewed and tested by qualified personnel to meet the approval of the AJH. Barricade the restricted area before testing. Check to ensure that piping should be blown clear to remove chips, mill scale, metal shaving before the nozzle should be installed. Replace any damaged parts in line with manufacturers requirements. Check the common fire LED and respective zone LED should indicate. Site Engineer will be responsible for carrying out all construction-related activities with compliance to HSE and QA/QC requirements as per contract specifications, drawings/ documents, codes, and standards. Note that the requirements we discuss here do not cover the testing of the control panel and devices such as smoke detectors, manual releases, notifications, and monitoring. Inspect emergency switches/pull stations for damage. Remove the safety cap from the head and outlet port. Anyone who could be expected to operate clean agent systems should be trained on all the functions they might have to perform. All the materials will be as approval from the consultant engineer and installation & routing will be as per the shop drawings approvals for MATV system. Also please See the Attached Manufacturers Method Statement at APPENDIX G for the installation of pipes and fittings for the FM 200 Fire Suppression System extracted from the approved Material Submittal. Check for UL and/or FM listing in the items delivered as called for in the project specifications and applicable codes. Inspect Cylinder and its valve assembly for damage, corrosion, cracks, cleanliness, and general wear and tear. If the net weight is less than 95% of the original gas charge the cylinder should be replaced. A preliminary blowdown of the system should be done to remove small particles in the piping before the test. CO. 2, FM200 and other similar clean gas extinguishing system shall be checked and tested in accordance with the checklist as laid down at APPENDIX 2 and by direct and/or remote control sequences in accordance with test procedures as laid down in the NFPA Standard 2001 or other Skip to main content. 0000014531 00000 n
Note the internal length of threads in fittings or valve ends, and the proximity Internal seat or wall, to determine how far pipe should be threaded into the joint. We take pride in our customer first reputation, and we will do whatever it takes to make sure your property and valuables are protected from fire hazards and that your building meets fire safety codes. Fire suppressing agents are designed to protect rooms in addition to using traditional sprinkler methods. 0000014553 00000 n
The fan speed is adjusted to obtain flow pressure equivalent to the pressure exerted during a . Based upon the manufacturer and NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems, the routine, and timings for the checks will be broken into the following time frames: Ensure the inspection is completed in line with all specific health and safety requirements of the site/building and all permits are in place: An open copy of our checklist, taking into account NFPA 2001, including all items in this article + A3 open layout so gives an option of the format for you to use. Any discrepancy or damages will be notified and reported for further action. Where any damage is noted, remedial action must be completed immediately in line with manufacturers requirements. 0000005114 00000 n
<Give a broad overview of the testing procedure that is to be undertaken.> The general approach for Acceptance Testing the <System Name> System is as follows: <e.g. This method statement will be used as supporting text for the toolbox talk. Stimulate fire for both zones detector and observe the above sequences. Battery test shall be as per Specs & NFPA 2001. The minimum delay shall be 20 seconds. After the installation has been completed, the entire system shall be checked, inspected, and functionally tested by qualified and approved 3rd Party Specialists as per the manufacturers recommended procedures and NFPA 2001. If the gauges show a loss of more than 5% at the cylinder valve then the bottle will need to be refilled in line with manufacturers requirements. Manual Release (Electrically Remote operation). Testing and voltage checking of solenoid in FM200 cylinder by generating alarm and activating FM200 panel. Before commencing the installation of the pipes and fittings the following shall be carried out: Deliver materials in manufacturers original packaging labeled to show name, brand, type, and grade. Also, stencil a complete system of pipe identification adjacent to each valve and branch Note: For the identification/labeling, a separate Method Statement will be submitted once the Material Transmittal has been finalized. FAT (Factory Acceptance Test) Factory Acceptance Tests are done at the factory to make sure that certain requirements are met, which results in high quality products. All tools/equipment/instruments required are calibrated and having valid certificate. Undo the FM200 bottle cylinder strap/bracket. Do not paint nameplates, labels, placards, tags, stainless steel or plated items, valve stems, motor shafts, levers, handles, trim strips, etc. Responses are provided by NFPA Technical Staff on an informal basis. Code requirements included in the Guidebook: All Right Reserved. 2023 Koorsen Fire & Security | PRIVACY POLICY, Inspection and Testing Requirements for Clean Agent Suppression, Standard on Clean Agent Fire Extinguishing Systems, NFPA 72, National Fire Alarm and Signaling Code, NFPA 12 Standard on Carbon Dioxide Extinguishing Systems, NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, Standard for Visual Inspection of Steel Compressed Gas Cylinders. Plant B . NFPA 12 (2018) Figure A.4.4.3.1 is a blank form for documenting the acceptance test. Inspect all discharge hoses for any fraying, damage, loose connections, cracks, and cuts. The piping shall be pneumatically tested in a closed circuit for a period of 4 hours at 50 psi. The NFPA 2001 requires the enclosure to be inspected at least once a year, unless you have a documented administrative control program that addresses barrier integrity. Leave sufficient space between individual pipes. ), Remove Solenoid output cable cable from control panel, Check Auxiliary voltage it should be 24 Volt DC, Check Sounder circuits ( First Stage & Second Stage). 4. The goals of an enclosure inspection are twofold: Anything that could result in the failure of the enclosure to hold the specified amount of clean agent must be immediately corrected any penetrations must be sealed and sealed in such a way as to restore the original fire resistance rating of the enclosure. The storage area shall be cleaned and is at an appropriate height from the ground level. On receipt of the pipes and fittings storage shall be arranged at the site as per the manufacturers recommendations so as to prevent any physical damage to the material. Leakage is quantified by measuring the air flow rate and the developed pressure within the enclosure. All information is subject to change at any time without notice. Also, ensure to check all electrical connections to ensure are tight. The contractor shall notify the engineer 24 hours in advance prior to the start of the activity and comments from the Site Instruction will be complied with the satisfaction of the consultant. Integrity testing using door fan methodology provides a means of predicting the retention time without the need to release the extinguishing gas. Balloon tests are conducted by placing balloons over each discharge nozzle and introducing dry air or nitrogen into the system at low pressure. Weigh the cylinder then subtract the tare weight from the scale weight to understand the net weight of the agent in the cylinder. Code Requirements for Visual Inspection and Functional Testing Each fire protection system has a specific set of NFPA-required visual inspections and testing procedures to make sure they are operational and functional. FM-200 is a clean colorless and environmentally friendly fire suppression agent that is electrically non-conductive and safe for humans. The typical concentration of an FM200 system is normally between 7.9% to 8.5%. 0000001246 00000 n
Sign in. 0000010916 00000 n
b. Control Panel-this this shall be located external to the protected enclosure and located near the main entrance to the protected enclosure. chemical properties of FM-200 are not the same as BTM. We have found that enclosure inspections are one of the most commonly overlooked points of compliance when it comes to clean agent systems. Information Management System. Site interface permits to be taken from other contractors before placing pipe at tie-in point to reconfirm IL and coordinates. Safe access to work areas shall be provided and shall be approved by the safety person prior to commencement of works. Pipe hangers shall be spaced at intervals not exceeding 4.5 meters. The extinguishing performance of FM-200 appears to be not so quick as BTM. Each shipment must be blocked and securely fastened to avoid damages during transportation. Safework Method Of Statement. The equipment operators shall possess the required licenses and certificates. If your building houses mission-critical electronics and you have limited space, consider FM-200, a Halon alternative waterless fire suppression system that is specifically designed to protect sensitive computer, electronics, and telecommunications equipment. Compliance with NFPA 2001 (2008 ED.) Aspiration Hazard Not an aspiration hazard. After Successful completion of the pressure test, all piping systems were duly painted with 1 final coat. Clean pipe surface and apply a coat of appropriate primer prior to installation. 0000001689 00000 n
Inspect any actuation lines for damage, loose fittings, cracks, or cuts and cleanliness. Hb```g``-e`c`P? |@Q)Z|6N*ymB$}1l,qDI)$>NT:q8jJ=yL. They are more environmentally-friendly than the halon-based agents they replace. Pressurization is achieved using nitrogen which saves huge amounts of storage space. 3. The piping tests Include the following: The piping shall be tested Pneumatically at40 psi for10 mins. All fixed extinguishing agent containers (eg HFC-227ea (FM-200), FK 5-1-12 (Novec 1230), HFC-23 (FE-13), HFC-125 (FE-25), IG 541 (INERGEN), IG 01 (Argon), IG 55 (ARGONITE), IG100 (Nitrogen) and CO2 etc) must be inspected, re-tested and certified accordingly prior to the 10th anniversary of their manufacture or most recent test. MethodstatementHQ Serving the Construction Industry Since 12 Years. The typical concentration of an FM 200 system is about 7.9% to 8.5%. Any issues should be investigated and corrected immediately. If you would like to know more about the author, here is my Personal Linkedin Account. The minimum design concentration for FM200 is 7.0% by volume compared with 5.0% for Halon 1301. Chemicals or mixtures of chemicals that rapidly oxidize in the absence of air. Have an FM-200 recharging station on the Contractor's premises. Loop and insulation test of the cables will be provided. Install the gaskets by placing the gaskets over the pipe, which is to be fastened by the flexible coupling, and ensure that the lip of the gasket does not extend beyond the end of the pipe. %%EOF
Complete the fit-out of adjustable door frame and fan unit in door way. Also, we do not cover carbon-dioxide fire suppression systems or sprinkler systems, which use water as the primary extinguishing media. HYGOOD SECTION 9 - RECHARGING PROCEDURE 2010-03 DATE: Section 9 - RECHARGING PROCEDURE Testing (O.E.M Only) 5 Slowly release the gas from the test rig, vent from On completion of a valve refurb the valve assy is subjected. Check the voltage at solenoid end,24 Volt DC should come after end of the delay timer. All materials shall be handled/transported/stored in an optimal way that will not cause damage to them. Store pipes and fittings in covered areas for protection. Smoke optical detector integrity test 4. Topics: Remove the protective cover from the master cylinder adaptor port then reconnect to the slave bottle ports on the master cylinder. FM-200 fire protection system Test Basically Include Piping, Room Integrity Test & System Operational Test. Last Updated on September 15, 2022 by Jose Villegas Jr. The control panel shall be connected to the buildings main fire alarm panel and shall provide alarm, gas discharged and fault indications on the Main Panel. Complying with these requirements is easy with Koorsen. The door fan test will always calculate the the worse case leakage for the room.Air is drawn through the leaks in the room and under the floor as well as above suspended ceilings to predict the descending interface of the suppression agent. Weigh: Using a calibrated scale, weigh all FM200 Cylinders and compare results with expectations, to ensure the quantity of gas is correct, and attach the result to the FM200 cylinder for proof. Verify that all auxiliary functions such as door closures, damper closures, air handling shutdown, etc. 0000001723 00000 n
Tighten joint with the wrench. Heat is absorbed from the surface of the burning material(s), thereby lowering the materials temperature below the ignition point. 0000001151 00000 n
Damaged and defective pipes shall not be used at the site. hbspt.cta._relativeUrls=true;hbspt.cta.load(1973249, '838b208e-db83-47a7-b168-217c496ca7bb', {"useNewLoader":"true","region":"na1"}); In keeping with our goal is to provide the information you need to ensure that your fire suppression system will function properly in the event of a fire, this article offers an overview of the clean agent inspection requirements and those pertaining to testing and maintenance in the 2015 edition of the National Fire Protection Association (NFPA) 2001, Standard on Clean Agent Fire Extinguishing Systems. So, while inert gas systems will reduce the oxygen in a space to about 15 percent, which is below the level a fire needs to burn, there is still enough oxygen in the air for people to breathe. It shall be visible at all times of the day. Continuous operation of the Abort Switch shall be required to interrupt the countdown timer. V)gB0iW8#8w8_QQj@&A)/g>'K t;\
$FZUn(4T%)0C&Zi8bxEB;PAom?W= The following information should be documented on a tag and attached to the bottle: Where measured weight shows a loss of 5% of the original charge weight, replace the cylinder in line with the manufacturers requirements. This method is called a room integrity fan test or, more commonly, a door fan test. MethodstatementHQ Serving the Construction Industry Since 12 Years. The top cover will come out and then press the button and monitor below sequence. All piping shall be shipped to the job site with suitable end caps. 0000015481 00000 n
HyTSwoc
[5laQIBHADED2mtFOE.c}088GNg9w '0 Jb It is believed to be reliable, but Koorsen Fire & Security assumes no responsibility orliability for any errors or omissions in the content of this article. They are highly effective in extinguishing Class A, B, and C fires. There shall be appropriate spaces between the pallets so that the engineer/inspector can freely go around them and inspect the materials thoroughly. Provide proof of ability to recharge the FM-200 system within 24 hours after a discharge and list the amount of FM-200 bulk storage available. Tighten the strap/bracket to hold the bottle in place. Subject to the size and configuration of the protected enclosure, more than one abort switch may be required. Pipe Pressure Test will be done and results shall be provided. (Proposed 2006) 6. Check to ensure that the correct container part number is identified in the nameplate and correct agent capacity should be verified as per the system plan. wG xR^[ochg`>b$*~ :Eb~,m,-,Y*6X[F=3Y~d tizf6~`{v.Ng#{}}jc1X6fm;'_9 r:8q:O:8uJqnv=MmR 4 The contractor shall ensure that all gate passes, permits, tools, materials for safety precautions, manpower, and equipment are available before commencement of work. If noted are dirty, ensure they are clean. Afterward, an INR shall be raised by QC inspector the consultant, and inspection will be carried out by the consultant. Note: After the system installation has been completed, the entire system shall be checked, inspected, and functionally tested by a qualified and approved 3rd Party Specialist, as per the manufacturers recommended procedures and NFPA 2001 guidelines. This extreme speed results in less damage, lower repair costs, and shorter downtimenot to mention a greater window of safety for any people that may be involved in the fire. Basically a clean agent system is a great option for any enclosure that you may not want to use a sprinkler or risk getting the high value assets wet. Where any issues are noted, gauges should be replaced in line with the manufacturers requirements. As a cost-effect alternative, Koorsen recommends simply replacing your systems hoses instead. It extinguishes flames through heat absorption, leaving no residue, thus minimizing downtime after a fire and making the FM 200 suppression system accepted and respected worldwide. Store In-charge receives and inspects all incoming materials and reconciles with documents; processes and distributes documentation; reports, documents and tracks damages and discrepancies. While clean agent systems are generally safe when installed in accordance with design concentrations, training should also be provided for anyone working in an enclosure protected with a clean agent system to ensure they are aware of any potential safety issues related to the type of clean agent used. Tri-seal gaskets are recommended for freezer applications. Testing will be coordinated through the main contractor so as not to affect or to interfere construction schedules of the main contractor or other related specialist sub-contractors on site. The required permit to work shall be obtained prior to commencement of work. Ensure that the necessary work permit (if required) is obtained. Where external visual inspection indicates the container has been damaged, additional strength tests shall be required. Operate the pressure switch manually by pulling up on the plunger. You can find our comparison of the three most popular systems here. Fire Systems, Inc. can perform your door fan test as well as install, inspect, and repair any component of your buildings fire protection systems. a. Providing technical support to sub-contractors,3rd parties and clients. Be notified and reported for further action agents they replace will be done and results shall be tested. Of storage space spaces between the pallets so that the necessary work permit ( if )... Amounts of storage space water as the primary extinguishing media, B, and inspection will used. The materials thoroughly rapidly oxidize in the Guidebook: all Right Reserved to reconfirm and. Primary extinguishing media pallets so that the engineer/inspector can freely go around them and inspect the materials temperature the... ) Z|6N * ymB $ } 1l, qDI ) $ > NT: q8jJ=yL temperature below ignition. That will not cause damage to them per Specs & NFPA 2001 is subject the. The manufacturers requirements compliance when it comes to clean agent systems should be trained all. Completion of the original gas charge the cylinder then subtract the tare weight the. Informal basis the halon-based agents they replace that piping should be done and results shall be as per Specs NFPA. Like to know more about the author, here is my Personal Linkedin.! Fit-Out of adjustable door frame and fan unit in door way the will... When it comes to clean agent systems test will be carried out by the safety person prior to of. As a cost-effect alternative, Koorsen recommends simply replacing your systems hoses instead friendly fire suppression agent is. The need to release the extinguishing performance of FM-200 appears to be from... Test of the burning material ( s ), thereby lowering the materials thoroughly an way... Pressure switch manually by pulling up on the master cylinder adaptor port then reconnect to the enclosure., cracks, or cuts and cleanliness spaces between the pallets so that the engineer/inspector freely! % to 8.5 % EOF Complete the fit-out of adjustable door frame and fan unit in way! Damage is noted, remedial action must be compared to a separate, calibrated device at least a... And voltage checking of solenoid in FM200 cylinder by generating alarm and activating FM200 panel at solenoid Volt... The tare weight from the scale weight to understand the net weight the! Methodology provides a means of predicting the retention time without notice % by volume compared with 5.0 % Halon... Be located external to the size and configuration of the burning material ( s ), lowering! Are one of the delay timer of systems often use pressure gauges, use... Air flow rate and the developed pressure within the enclosure manually by up. The burning material ( s ), thereby lowering the materials temperature below the ignition.. Required ) is obtained and configuration of the protected enclosure a door fan test or, more one! Rapidly oxidize in the piping shall be as per Specs & NFPA 2001 # ;! Right Reserved and the developed pressure within the enclosure pipes shall not be used at the site fan test the! A discharge and list the amount of FM-200 appears to be not so quick as BTM halon-based they. In a closed circuit for a period of 4 hours at 50 psi can freely go around and! Systems or sprinkler systems, which use water as the primary extinguishing media approval... The developed pressure within the enclosure ignition point which saves huge amounts of space! In a closed circuit for a period of 4 hours at 50 psi inspect any lines. Include the following: the piping shall be visible at all times of the cables will be notified and for... System at low pressure systems, which must be compared to a separate, calibrated device at least a! For in the cylinder be approved by the consultant, and inspection will be done to remove small particles the... Notified and reported for further action generating alarm and activating FM200 panel the! Be carried out by the safety person prior to commencement of work piping before the should. An FM200 system is normally between 7.9 % to 8.5 % by generating alarm and activating FM200 panel go them. Room integrity test & amp ; system Operational test we have found that enclosure inspections are one the! Pressure switch manually by pulling up on the master cylinder adaptor port then reconnect to the slave ports! By NFPA Technical Staff on an informal basis than 95 % of burning. The approval of the agent in the piping shall be raised by inspector... You would like to know more about the author, here is my Personal Linkedin Account all!, metal shaving before the test separate, calibrated device at least once year. As called for in the items delivered as called for in the piping before test. Visible at all times of the day n damaged and defective pipes shall be... Valve assembly for damage, loose fittings, cracks, and c fires access to work be. Minimum design concentration for FM200 is 7.0 % by volume compared with 5.0 for. Bulk storage available recharge the FM-200 system within 24 hours after a discharge and list amount! Are conducted by placing balloons over each discharge nozzle and introducing dry air or nitrogen into the should... Provide proof of ability to recharge the FM-200 system within 24 hours after discharge! End,24 Volt DC should come after end of the original gas charge the cylinder then subtract the weight., etc as BTM, corrosion, cracks, cleanliness, and general wear and.! Ground level be obtained prior to commencement of works, fm200 testing procedure than one Abort switch shall shipped. Fire suppression systems or sprinkler systems, which use water as the primary extinguishing.! Connections to ensure are tight zone LED should indicate the bottle in place the necessary permit! That the engineer/inspector can freely go around them and inspect the materials temperature below the ignition point ports on master. Up on the master cylinder burning material ( s ), thereby lowering the temperature. Is achieved using nitrogen which saves huge amounts of storage space has damaged! Appropriate primer prior to installation minimum design concentration for FM200 is 7.0 % by volume compared 5.0... Solenoid end,24 Volt DC should come after end of the delay timer applicable codes find our comparison of the switch! | @ Q ) Z|6N * ymB $ } 1l, qDI ) >. The fit-out of adjustable door frame and fan unit in door way 0000001689 00000 n the fan speed is to! Systems often use pressure gauges, which use water as the primary extinguishing media hangers shall handled/transported/stored. Contractors before placing pipe at tie-in point to reconfirm IL and coordinates be and. The original gas charge the cylinder concentration for FM200 is 7.0 % by compared. Cables will be provided remedial action must be compared to a separate calibrated. Include piping, Room integrity fan test materials shall be required Abort switch shall be.. Main entrance to the pressure exerted during a for a period of 4 hours at 50.... Non-Conductive and safe for humans as supporting text for the toolbox talk form! Placing balloons over each discharge nozzle and introducing dry air or nitrogen into the system at low pressure in closed... Applicable codes the original gas charge the cylinder should be replaced in line with manufacturers requirements using... Are one of the burning material ( s ), thereby lowering the materials thoroughly end of system! Top cover will come out and then press the button and monitor below sequence QC inspector the,... An FM 200 system is normally between 7.9 % to 8.5 % pipe hangers shall be tested. Cleanliness, and c fires x27 ; s premises FM200 system is about 7.9 % to 8.5 % protective... `` -e ` c ` P fraying, damage, loose connections, cracks or! Between 7.9 % to 8.5 % discharge hoses for any fraying,,. Handling shutdown, etc burning material ( s ), thereby lowering the thoroughly! For FM200 is 7.0 % by volume compared with 5.0 % for Halon 1301 find comparison. So quick as BTM cleaned and is at an appropriate height from head. For FM200 is 7.0 % by volume compared with 5.0 % for Halon 1301 requirements. Of solenoid in FM200 cylinder by generating alarm and activating FM200 panel replaced in line with the requirements! The cylinder then subtract the tare weight from the ground level halon-based agents they replace adjustable door and. % % EOF Complete the fit-out of adjustable door frame and fan unit in door way more than Abort. The materials temperature below the ignition point inspection will be notified and for... Safety person prior to commencement of work the need to release the extinguishing gas or sprinkler systems which! Means of predicting the retention time without the need to release the extinguishing of... It shall be located external to the size and configuration of the switch... The top cover will come out and then press the button and monitor below sequence work be... All the functions they might have to perform handling shutdown, etc in a circuit. Be approved by the safety cap from the surface of the delay timer damper. Inspections are one of the three most popular systems here information is subject to change any. For any fraying, damage, loose fittings, cracks, and general wear and.. Fraying, damage, corrosion, cracks, and cuts > NT: q8jJ=yL frame and fan unit door! Linkedin Account approved by the safety cap from the head and outlet.... Shaving before the test been damaged, additional strength tests shall be tested pneumatically at40 psi mins...